Electricity Access Discussions and Stakeholder Workshops
Electricity access and power system planning is a complicated problem requiring the cooperation of many stakeholders. August 13, 2019 by Dr. Destenie Nock There are many equality and sustainability objectives intertwined in electricity planning. In 2018 Ghana had 0.3% of electricity generation and 0.5% of installed capacity coming from renewable energy (solar, excluding hydro). The target for the country was originally to have 10% renewable penetration by 2020, but with 2020